![]() ![]() Plunging, air lifting and section-by-section pumpingĪfter we have pumped out all loose and floating contaminations from your well, we then begin a plunging process. ![]() Maximum well capacity and an increased lifespanĪs all potential causes of clogging are removed from your wells, they will deliver maximum capacity and have a longer lifespan. This also delays the onset of any future blockage of the well and therefore the regeneration interval is significantly reduced. This reduces the energy consumption of the well substantially. Due to decreased resistance a maximum flow on both extraction and infiltration is achieved when the water passes through the well filter and gravel pack. When developing new wells, Q-Flow ensures that all clogging is removed and all causes of clogging are eliminated.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |